Syntegra Consulting commissioned to design electrical and heating systems in Our Lady of Lourdes Catholic Church in Surrey. The development was undertaken in two phases.
Phase One: a nursery- work completed using split heat pump and upgrading electrical works.
Phase Two: Stripping out existing gas fired warm air system and replacing with a more efficient system comprising of gas fired condensing boiler controls, distributing pipe work and strategically located fan cool units. Fan cool units are designed to run at full speed at preheat periods and reduce speed during mass times.
Installation to be completed summer 2011.