BREEAM 2011 New Construction: Understanding the Key Changes

You are here: 

Quick Answer

BREEAM 2011 New Construction is a prominent environmental assessment method designed to evaluate and certify the sustainability performance of new building projects. This specific version provides a comprehensive framework for developers to integrate best practices in design, construction, and operation, covering various environmental categories such as energy, water, materials, and pollution. Syntegra Group utilizes this standard to help ensure new constructions meet rigorous environmental benchmarks, promoting more sustainable and resource-efficient developments.

In July 2011 the BRE launched the new BREEAM 2011 scheme. The launch of the new scheme has caused a bit of confusion among the construction industry professionals. In most cases people ask what the difference between BREEAM 2008 and BREEAM 2011 is.

Syntegra Consulting as accredited BREEAM assessors will explain in simple terms the difference between BREEAM 2008 and 2011.

Under BREEAM 2008 there were 9No schemes plus BREEAM bespoke which assessed the buildings that didn’t fall under the 9No schemes criteria. The 9No schemes under BREEAM 2008 were:

  • Offices
  • Industrial units
  • Retail
  • Education
  • Healthcare
  • Multi-residential
  • Prisons
  • Courts
  • Data Centres

Each of the above schemes had its own BREEAM technical manual and assessment criteria. This has now changed with BREEAM 2011 and all the previous separate schemes under BREEAM 2008 have been included in a single, consolidated scheme document containing all ‘new construction’ assessment issues and criteria relevant to the range of schemes assessed using BREEAM 2008 and BREEAM bespoke in the UK. In more detail, the following building types can be assessed under the BREEAM 2011 New Construction technical manual:

Ø   Offices

Ø   Industrial units

Ø   Retail

Ø   Schools

Ø   Further Education

Ø   Higher Education

Ø   Healthcare

Ø   Multi-residential

Ø   Prisons

Ø   Courts

Ø   Other Building Types

Therefore, BREEAM 2011 will be applicable to the same range of building types covered by the BREEAM 2008 plus “Other Building types”. The BREEAM Other Buildings includes the type of buildings that were previously assessed under BREEAM Bespoke. The scope of the ‘BREEAM 2011 New Construction’ scheme now includes building types previously assessed under BREEAM Bespoke, such as hotels, leisure

centres, places of worship and community buildings. This means that the additional costs for the development of bespoke criteria no longer apply.

The stages of the BREEAM assessment haven’t changed under BREEAM 2011. So, as before the assessment will consist of   i) a Pre-assessment study, which should be undertaken at the concept design stage of a project, ii) Design stage assessment /BREEAM Interim certificate and iii) Final assessment/Post construction certificate. From, our experience in order to achieve the desired BREEAM rating, it is crucial to start the BREEAM assessment process from the very early stages of a new construction project. Also, it should be noted that nowadays more and more Local Authorities ask for BREEAM assessments as part of the planning conditions.

For more information on BREEAM 2011, please contact Syntegra Consulting on T: 08450 091625 and Email: mail@syntegra-epc.co.uk

Latest Posts

The latest posts from Syntegra Group's blog include: Why New Builds Need Heat Pumps: Low-Carbon Heating Under Part L 2026 (September 25, 2026); Biodiversity Net Gain BNG: What the August 2026 Changes Mean for Your Project (September 22, 2026); Future Homes Standard 2027: When Developers Need to Make Key Energy Decisions (September 17, 2026); and The 2027 Deadline: How to Future‑Proof Projects Starting in the Next 24 Months (July 23, 2026).

Frequently Asked Questions

1 What is BREEAM 2011 New Construction?

BREEAM 2011 New Construction is an environmental assessment method for new non-domestic buildings. It evaluates the sustainability performance of a building across various categories, including energy, water, waste, and pollution. Achieving certification demonstrates a commitment to sustainable design and construction practices.

2 Why should I consider BREEAM 2011 certification for my new construction project?

BREEAM 2011 certification helps to reduce the environmental impact of new buildings and can lead to lower operating costs through improved energy and water efficiency. It also enhances a building's marketability and demonstrates corporate social responsibility.

3 How can Syntegra Group assist with BREEAM 2011 New Construction assessments?

Syntegra Group offers BREEAM Assessment services, which include guiding projects through the certification process for BREEAM 2011 New Construction. Their expertise covers various aspects of sustainable building design and environmental impact assessment to help achieve desired ratings.

4 Is BREEAM 2011 New Construction still a relevant standard for current projects?

While newer versions of BREEAM exist, BREEAM 2011 New Construction remains relevant for projects initiated or designed under its guidelines. It provides a robust framework for assessing and improving the environmental performance of buildings. Syntegra Group can advise on the most appropriate BREEAM standard for your specific project.