Specialists Warn Government: Rising BIM Costs Hinder BIM Adoption

You are here: 

Quick Answer

Industry specialists are cautioning the UK government regarding the substantial costs associated with the implementation of Building Information Modelling (BIM) across public sector projects. These warnings underscore the need for careful financial planning and resource allocation to manage the initial investment and ongoing operational expenses of BIM technologies. The experts aim to ensure the government fully understands the economic challenges to effectively leverage BIM's long-term benefits in construction and infrastructure development.

Building information modelling (BIM) is a new way of approaching the design and documentation of building projects.

  • Building : the entire life-cycle of the building is considered (design/build/operations)
  • Information : BIM data can be used to illustrate the building life cycle, from cradle to cradle
  • Modelling : defining and simulating the building, its delivery, and operation using integrated tools

The Government Construction Strategy was published by the Cabinet Office on 31 May 2011 and revealed the Governments intention to require 3D BIM (with all projects and asset information, documentation and data being electronic) on its projects by 2016. Essentially the UK Government has embarked with industry on a four year programme for sector modernisation with the key objective of: reducing capital cost and the carbon burden from the construction and operation of the built environment by 20%.

However, specialist contractors are struggling to adopt BIM because of rising software costs and poor practice by tier one contractors, and industry briefing to government has warned. The briefing, seen by Building Magazine, which was prepared by the Specialist Engineering Contractors Group (SEC) and has been sent to Cabinet Office ministers, catalogues a series of problems faced by specialist firms. The briefing has claimed that software providers are pushing up prices as a result of high license fees and poor adaptability between different software packages. It accused larger contractors of not bringing specialists into the design process early enough, offering poor value ‘BIM seminars’ and “dumping” responsibility for information management and data coordination onto sub-contractors at a cost of up to £150,000 a project. It is also highly critical of inadaptable software and there is a “real danger that BIM development will be driven by software houses [rather than firms]. It gives an example of an M&E firm that was forced to sped £5,000 getting BIM model converted into a usable format.

A BIM system uses a computer generated model to collect and manage information about the project. It is especially useful where many parties, for example different sub-contractors, provide input on the same project. Any changes to the design of a project made during its construction are automatically applied to the model.

David Frise, chair of the BIM group at SEC Group, said: “You’ve got to engage with the supply chain and with organisation that are…in survival mode”

Latest Posts

Frequently Asked Questions

1 What is the primary concern specialists are raising with the government regarding BIM?

Specialists are warning the government about the costs associated with Building Information Modelling (BIM). The specific details of these concerns are not provided in the available content.

2 Does Syntegra Group offer services related to Building Information Modelling?

Yes, the Syntegra Group's navigation menu lists "Building Information Modelling in UK" as one of its services. This indicates their involvement and expertise in this area.