Kensington Hotel – Building Energy Efficiency Investigation Case studies,Leisure Sector Case studies / December 2, 2014
Energy Strategy Report, BREEAM Assessor – 105-107 New Road, Whitechapel, E1 Case studies,Leisure Sector Case studies / September 25, 2013
Energy Strategy Report – South Woodford Mosque, 10-14 Mulberry Way, London, E18 Case studies,Leisure Sector Case studies / September 9, 2013
BREEAM and SBEM Consultants – Bolnore Sports Pavilion, Haywards Heath Case studies,Leisure Sector Case studies / July 31, 2013
Mander Shopping Centre- commercial energy audits Case studies,Leisure Sector Case studies / September 28, 2012
Building Services Design Consultancy – Sol Joel, New Build Sports Pavilion Case studies,Leisure Sector Case studies / August 20, 2012
Energy Consultancy & Outline M&E Design Consultancy: Manor House – Conversion (Hospital to Spiritual Centre) Case studies,Leisure Sector Case studies / August 16, 2012
Commercial Energy Performance Certificate – Jamia Ahmaddiyya, 2 South Gardens, London, SW19 2NT Case studies,Leisure Sector Case studies / May 17, 2012
Lewisham Premier Inn Energy Strategy/Statement Report 2011 & BREEAM Pre-Assessment Case studies,Leisure Sector Case studies / May 4, 2012
BREEAM Assessment & Energy strategy report – New Hotel & Leisure facility, Liddington, Wiltshire, SN4 Case studies,Leisure Sector Case studies / April 10, 2012
Syntegra Consulting successfully carried out a commercial Energy Performance Certificate (EPC) at The Wyndham Hotel, London, W1 Case studies,Leisure Sector Case studies / March 16, 2012
M&E design consultants and BREEAM consultant – New Cultural building, 49 Baintree Street, London, E2 0EX Case studies,Leisure Sector Case studies / November 26, 2011
Energy audit large 20,000sqft leisure facility in Eastborune, BH21 Case studies,Leisure Sector Case studies / October 3, 2011
Air Conditioning energy inspection (ACI) in London Case studies,Leisure Sector Case studies / September 14, 2011
Energy Consultants – Longleat CentreParcs, Warminster, Wiltshire Case studies,Leisure Sector Case studies / September 3, 2011
Major refurbishment works contract – Our Lady of Lourdes Church, Thames Ditton,Surrey Case studies,Leisure Sector Case studies / February 14, 2011
AC Inspection – Bromley Court Hotel, Bromley, BR1 4JD Case studies,Leisure Sector Case studies / December 6, 2010
Energy Consultant London – Eden Plaza Hotel, Kensington, London, SW7 Case studies,Leisure Sector Case studies / October 10, 2010
LED lighting survey & feasibility Consultant – Woodside Lodges Country Park, Ledbury, Herefordshire, HR8 Case studies,Leisure Sector Case studies / September 28, 2010
M&E Consultants – Our Lady of Lourdes, Thames Ditton, Surrey, KT7 0LP Case studies,Leisure Sector Case studies / July 19, 2010
Air Conditioning inspection assessments – Nottinghamshire Case studies,Leisure Sector Case studies / March 26, 2010