When are Air Conditioning Inspections(ACI) required?

You are here: 

ACI legislation stipulates the following:

  • New AC installations installed from 1st January 2008 must be inspected within 5 years
  • All other air-conditioning systems with an effective rated output > 250kW must be inspected by January 2009
  • Air-conditioning systems with an effective rated output > 12 kW must be inspected by January 2011

All ACI inspections should be carried out by an accredited Air Conditioning Energy Assessor.

Latest Posts