Andover Sports Centre – M & E Consultancy

Syntegra consulting successfully appointed in the  role of M&E consultants for the Andover Sports Pavilion, the design stage included; Public health specification and design Mechanical & electrical specification and design Below ground drainage specification and design  

Part G Water Efficiency- Residential Conversion 116-120 Whippendell Road Watford

Syntegra Consulting has been appointed as MEP design consultants and energy consultants to provide the water regulation drawing and the Part G Water Efficiency report for the conversion of the 166-120 Whippendell Road into 3 flats in Watford. At Syntegra Consulting, our team are highly experienced in completing these calculations for a variety of different […]

MEP Design- Flat Refurbishment 33 Dover St. London

Syntegra Consulting has been appointed as MEP design consultants to provide the mechanical drawings including SAP assessments based on proposed scheme U-values for the refurbishment of the 33 Dover Street flat in London. We have provided two different types of underfloor heating (UFH) systems as requested by the client – an electric UFH system and […]

2 Ada Street, London – Syntegra appointed MEP design consultants

Syntegra were appointed MEP design consultants to provide outline design, SAP assessments, EPCs and building Regs Part L compliance reports for a mixed use development consisting of 6 residential flats and 2 commercial units in Hackney, London. Syntegra Consulting have seen this project 2 Ada Street, London E8 shortlisted for the Hackney Design Award 2012. […]