Indoor Air Quality Plan – Plot C Farnborough Business Park

Syntegra Consulting has been appointed as indoor air quality consultants for Plot C, Farnborough Business Park. With poor indoor air quality now recognised as a major factor underlying occupant health issues and reduced productivity, it has become an important consideration for building design and management. In accordance with BREEAM’s stringent indoor air quality assessment criteria, […]

Abbey Chase Nursing Home: M&E Consultancy, Energy Consultancy & CDM Coordination

Syntegra Consulting Ltd has been appointed as Construction Design and Management (CDM) Co-ordinators, M&E and Energy Consultants for Abbey Chase Nursing Home in Chertsey, Surrey.  The project involves the extension of the second floor. The Construction Design and Management (CDM) Regulations 2007 places duties upon the Client, designers and contractors to prepare documentation for inclusion […]

Barking Road – Daylight & Sunlight Report

Syntegra Consulting Ltd have been appointed as daylight modelling consultants for a proposed scheme on Barking Road, London. Currently there is an existing industrial garage/workshop site, and the future project is to develop a mixed-use comprising two retail units at ground floor level, 18 one-bedroom flats and 4 two-bedroom flats divided in two three-story buildings […]

Leinster Mews, London – ESR , SAP

Syntegra Consulting Ltd have been appointed as Energy Consultants, SAP and CSH Assessors for the proposed scheme in Leinster Mews, London. It consists of a four-story family house, located in an urban residential area in London. The design of the proposed development has incorporated building fabric enhancement (above current building regulations requirements) to increase the […]

10-27 Connaught House, Muswell Hill, London – ESR, SAP

Syntegra Consulting Ltd have been appointed as Energy Consultants, SAP and CSH Assessors for the proposed scheme in Muswell Hill, London. It is comprised of 8 new residential units contained within the extended roof of the redeveloped building located in an urban residential area in London. The study has incorporated building fabric enhancement (above current […]

CDM Coordination – Imperial House in Wokingham – CEMAS

Syntegra Consulting Ltd have been appointed as Construction Design and Management (CDM) Co-ordinators for Imperial House in Wokingham.  The project involves the relocation of a chemical analysis laboratory from Glendale Park to the Imperial House Oaklands Park in Wokingham. The Construction Design and Management (CDM) Regulations 2007 places duties upon the Client, designers and contractors […]

Southend-on-Sea, Essex – SAP assessment, Part L1B compliance report & EPC

Syntegra Consulting Ltd have been appointed as energy consultants and SAP Assessors for the proposed scheme in Southend-on-Sea in Essex. It involves a conversion of an existing surgery to a residential scheme. Building Regulation Part L1B Compliance is required. Therefore calculations were made in order to show improvements in the CO2 emissions between the converted […]

Haldane Road, London –Daylight & Sunlight Report

Syntegra Consulting Ltd have been appointed as daylight modelling consultants for a proposed scheme on Haldane Road, London. There is an existing house and the proposed scheme is looking to increase the rear extension at ground and first floor. The study has been undertaken by constructing a 3D IES model of the existing and proposed […]

Richmond Hill, London

Syntegra Consulting Ltd have been appointed as Energy Consultants, SAP & BREEAM Assessors, Hydrology, Ecology and Acoustic Consultants and Daylight Modelling Consultants for the proposed scheme in Richmond Hill, London. It involves refurbishment and reconfiguration of an existing residential building to create five flats including a rear conservatory extension and rear light-well. Before After   […]